Project Description
Turn-Key Biomass Processing Solutions
R-Prime Alpha T-Free Remediation Systems
With BioPrime we guarantee that no one in the market compares to our quality or our unprecedented service. All of our R-Prime Remediation systems are carefully designed so they do not over oxidize your product like other conventional units in the market. All of our equipment internals have a minimum 304SS Food Grade. Everything can be fully automated eliminating the need for multiple operators. One operator can run 10 systems. Remote monitoring and data retrieval are made easy.

Bioprime R-Prime Alpha T-Free Remediation
model | 600 L | 800 L | 1000 L |
detailed system specifications | |||
Footprint | 40 ft2 | 60 ft 2 | 80 ft 2 |
Skid Length | 10 ft | 10 ft | 10 ft |
Skid Width | 4 ft | 6 ft | 8 ft |
Skid Height | 10 ft | 10 ft | 10 ft |
Weight | 5,000 lbs. | 6,500 lbs. | 8,000 lbs. |
requirements & consumption | |||
Electrical Requirements · Frequency · kVA · Certification · Control Panel Classification* * Higher panel ratings available upon request ** Electrical stabilization equipment available upon request |
60 Hz 3 kVA UL NEMA 4 |
60 Hz 5 kVA UL NEMA 4 |
60 Hz 8 kVA UL NEMA 4 |
Electrical Consumption · Required power supply · US average cost per kWh · Cost per hour |
15-8 kW 0.10 $/kWh $1.50-0.80/h |
20-10 kW 0.10 $/kWh $2-0.90/h |
25-15 kW 0.10 $/kWh $2.5-1.50/h |
Volume per Cycle | 450 L | 600 L | 900 L |
Conversion per Cycle | 99% | 99% | 99% |
Throughput · Based on composition of reactant |
Cycle (c) ≤ 10 days | Cycle (c) ≤ 10 days | Cycle (c) ≤ 10 days |
Total Cost (full system electric) Start-up & Peak · Total cost per hour · Total cost per liter Steady State (20% Peak) · Total cost per hour · Total cost per liter Total Cost per Cycle |
Total $1.50-0.80/h $0.80/L Total $0.96/h $0.512/L $360/cycle |
Total $2.00-0.90/h $0.80/L Total $1.08/h $0.43/L $480/cycle |
Total $2.50-1.50/h $0.80/L Total $1.80/h $0.54/L $600cycle |